Ground preparation, drainage and perimeter works for an artificial playing surface.

The objective
Prepare the site for installation of an all-weather playing surface.
The delivery challenge
Works took place during school term, with staging and access coordinated around the occupied site.
Alpine Civil’s approach
Unsuitable material was removed, the subgrade prepared and perimeter concrete, retaining and conduits installed before surface installation.
Scope of works
- Excavation and subgrade preparation
- Concrete perimeter and retaining wall
- Drainage and future lighting conduits
The outcome
The prepared base enabled Tiger Turf NZ to install the finished playing surface.
Project information adapted from Alpine Civil’s existing published case study. Approved detailed scope and supporting documentation are available by enquiry.
Explore related capabilityMore work on the ground.

Lake Hāwea pump station
Drainage & Three Waters
Underground services and substantial excavation for a new pump station and emergency wastewater storage.
Fulton Hogan, working for Queenstown Lakes District Council · November 2025 – April 2026

Clyde Heritage Precinct
Street Upgrades
Staged street, utility and public-space improvements in the historic heart of Clyde.
Fulton Hogan for Central Otago District Council · April–October 2023 · April–July 2024

Arthur’s Point network upgrade
Underground Utilities
Civil groundworks for relocated ring main units on a constrained roadside site.
Electronet for Aurora
On the ground.