Underground Utilities
Arthur’s Point network upgrade
Civil groundworks for relocated ring main units on a constrained roadside site.

The objective
Prepare a new raised location for replacement electricity network equipment.
The delivery challenge
Live high-voltage services, nearby water and communications networks, traffic and protected trees constrained the works.
Alpine Civil’s approach
Air excavation helped expose services. The team formed retaining walls, installed conduits, prepared the equipment base and reinstated disturbed surfaces. Electrical work was completed by Electronet.
Scope of works
- Service excavation and conduit installation
- Timber retaining walls and compacted equipment base
- Footpath reinstatement and landscaping
The outcome
The base was ready for installation, with surrounding footpaths and landscape reinstated.
Project information adapted from Alpine Civil’s existing published case study. Approved detailed scope and supporting documentation are available by enquiry.
Explore related capabilityMore work on the ground.

Lake Hāwea pump station
Drainage & Three Waters
Underground services and substantial excavation for a new pump station and emergency wastewater storage.
Fulton Hogan, working for Queenstown Lakes District Council · November 2025 – April 2026

Clyde Heritage Precinct
Street Upgrades
Staged street, utility and public-space improvements in the historic heart of Clyde.
Fulton Hogan for Central Otago District Council · April–October 2023 · April–July 2024

Rural bridge repair
Bridges
Bridge repairs and bank strengthening to restore a rural connection.
Client details available on request
On the ground.
START A CONVERSATION
Planning civil
works in Otago?
Share your scope, drawings or tender documents.
Let’s talk through what the project needs.