Bridges
Rural bridge repair
Bridge repairs and bank strengthening to restore a rural connection.

The objective
Repair the bridge and address the adjacent bank conditions.
The delivery challenge
Working around an existing structure called for a planned sequence and controlled access.
Alpine Civil’s approach
Bridge and bank works were coordinated as a single repair package. Contact the team for the approved detailed scope.
Scope of works
- Bridge repairs
- Bank strengthening
- Site access and reinstatement
The outcome
A practical example of the team’s bridge repair capability.
Project information adapted from Alpine Civil’s existing published case study. Approved detailed scope and supporting documentation are available by enquiry.
Explore related capabilityMore work on the ground.

Lake Hāwea pump station
Drainage & Three Waters
Underground services and substantial excavation for a new pump station and emergency wastewater storage.
Fulton Hogan, working for Queenstown Lakes District Council · November 2025 – April 2026

Clyde Heritage Precinct
Street Upgrades
Staged street, utility and public-space improvements in the historic heart of Clyde.
Fulton Hogan for Central Otago District Council · April–October 2023 · April–July 2024

Arthur’s Point network upgrade
Underground Utilities
Civil groundworks for relocated ring main units on a constrained roadside site.
Electronet for Aurora
On the ground.
START A CONVERSATION
Planning civil
works in Otago?
Share your scope, drawings or tender documents.
Let’s talk through what the project needs.


